Changi Airport Retention Pond

KBCE was responsible for the design and construction of the retention pond as well as associated drainage and backfilling works. 

Back to
Project List

In 2012, Koh Brothers was awarded a design and build contract by Changi Airport Group for the development of a proposed retention pond at Changi Airport. Under the contract, KBCE was responsible for the design and construction of the retention pond as well as associated drainage and backfilling works.

The main scope of work include, designing and building a proposed open Retention pond, proposed Drainage system and Tidal gate, including all necessary realignment, diversion, alterations to existing drains and/or drain connections, supporting accessories and drainage facilities, taking into consideration existing ground conditions.

Construction work commenced in November 2012 and was projected for completion by December 2014.